- Pagina inicial /
- Tools & Home Improvement /
- Safety & Security /
- Fire Safety /
- Smoke Detectors & Fire Alarms /
- 5V 12V 24V Flame Sensor Module Fire Alarm Con...
5V 12V 24V Flame Sensor Module Fire Alarm Control Relay Switch with 50cm Long Lead Wire for Fire Light Detection
STD 657225
Price Details
Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )
*All items will import from EUA
A Ubuy trabalha arduamente para proteger a sua segurança e privacidade. O nosso sistema avançado de segurança de pagamentos garante a confidencialidade ao encriptar as suas informações durante a transmissão, utilizando os protocolos AES (Normas de Encriptação Avançada) e SSL (Camada de Sockets Seguros). Os seus dados de pagamento estão 100% seguros, pois não partilhamos os seus dados de pagamento com vendedores terceiros.
This 24V flame sensor module is designed for precise flame detection, ensuring safety with adjustable sensitivity.
Fast
Shipping
Devolução
gratuita*
Embalagem Segura
Produtos 100% Originais
Certificação PCI DSS
Certificação ISO 27001
O que se Destaca
Detalhes do produto
| Item Weight | 0.1 lbs (50 grams) |
Quem Deverá Comprar?
-
Homeowners
Ideal for homeowners seeking to enhance fire detection in basements, kitchens, or attics with reliable alerts.
-
DIY Enthusiasts
Perfect for DIY project builders who want to integrate fire detection into automated systems or prototypes.
-
Safety Personnel
Valuable for safety professionals needing a cost-effective solution for fire detection in various environments.
-
Professional Fire Systems
May not meet the standards required for installation in professional fire alarm systems in commercial buildings.
-
Large Facilities
Not suitable for large industrial areas needing extensive fire detection capabilities beyond basic flame detection.
-
Panic-Prone Users
May not be appropriate for users who easily panic, as the sensor can trigger false alarms in non-threatening situations.
DESCRIÇÃO DO PRODUTO
5V 12V 24V Flame Sensor Module Fire Alarm Control Relay Switch with 50cm Long Lead Wire for Fire Light Detection
Perguntas e Respostas dos Clientes
-
pergunta:
What is the working voltage range for the Flame Sensor Module?
Resposta: The Flame Sensor Module operates at a voltage range of 5V to 24V. This versatility allows it to be connected to various power sources, making it suitable for a wide range of applications. For instance, if you are designing a small DIY fire detection system powered by a 5V power supply, this module is an ideal choice. In commercial settings, the 12V or 24V options may be used for larger fire alarm systems, ensuring consistent performance and reliable fire detection. -
pergunta:
How does the Flame Sensor Module detect fire?
Resposta: The Flame Sensor Module detects fire by monitoring infrared light emissions associated with flames. When the sensor detects a specific wavelength of infrared light, it triggers the relay switch, which can then activate an alarm or other safety mechanisms. This works exceptionally well in environments where rapid fire detection is crucial, such as in industrial settings or laboratories, allowing for quick and effective responses to potential fire hazards. -
pergunta:
What is the length of the lead wire, and how does it benefit installation?
Resposta: The Flame Sensor Module comes with a 50cm long lead wire, which provides significant flexibility during installation. This length allows you to position the sensor in optimal locations for effective fire detection without being restricted by proximity to the power source. For instance, if you are installing this sensor on a high ceiling or in a large room, the lead wire provides the necessary reach while ensuring that the sensor remains adequately placed for maximum reliability. -
pergunta:
Can this module be integrated into an existing alarm system?
Resposta: Yes, this Flame Sensor Module can be seamlessly integrated into existing fire alarm systems. The relay switch allows it to interface with standard alarm circuits, ensuring compatibility with most setups. For example, if you already have a fire alarm system in your premises, adding this module can enhance the system's responsiveness to flames, providing an extra layer of safety and peace of mind. -
pergunta:
What are the typical applications for the Flame Sensor Module?
Resposta: Typical applications for the Flame Sensor Module include fire detection in homes, offices, industrial environments, and laboratories. Its reliable performance makes it ideal for monitoring areas with flammable materials or heat sources. Additionally, it can be used in DIY projects to build custom fire alarm systems or incorporated into robotics for fire safety features. This versatility makes it a valuable component for both professional setups and hobbyist projects. -
pergunta:
Is the Flame Sensor Module waterproof?
Resposta: The Flame Sensor Module is not designed to be waterproof. It is important to use it in dry environments to ensure optimal performance and longevity. If you require flame detection in potentially wet areas, consider using protective housing or enclosures that can shield the module from moisture while still allowing it to function effectively. This ensures reliable usage in diverse conditions without compromising the sensor's functionality. -
pergunta:
What is the response time of the flame sensor?
Resposta: The Flame Sensor Module offers a rapid response time to flames, typically within seconds. This quick detection capability is critical in minimizing potential damage and risks posed by fire. Whether it's in a residential setting detecting a small kitchen fire or in an industrial setting monitoring large machinery, prompt alerts can make a significant difference in safety responses and evacuation protocols, ensuring a proactive approach to fire hazards. -
pergunta:
Can the sensor module differentiate between smoke and flame?
Resposta: The Flame Sensor Module is specifically designed to detect flames rather than smoke. It operates by sensing the infrared radiation emitted by flames, which means it responds to actual fires more accurately than smoke detectors. Therefore, for scenarios where flame detection is essential, like in industries dealing with flammable materials, this module is particularly effective, providing a focused answer to fire hazards. -
pergunta:
How should the sensor module be maintained for optimal performance?
Resposta: To ensure optimal performance of the Flame Sensor Module, it is recommended to periodically check its positioning and cleanliness. Dust or obstructions on the sensor may affect its ability to detect flames effectively. Regular inspections, particularly in environments prone to dust or debris, can help maintain its accuracy. Additionally, conducting functionality tests can ensure that the system remains ready to respond promptly in case of a fire. -
pergunta:
Where can I buy 5V 12V 24V Flame Sensor Module Fire Alarm Control Relay Switch with 50cm Long Lead Wire?
Resposta: You can purchase the 5V 12V 24V Flame Sensor Module Fire Alarm Control Relay Switch with 50cm Long Lead Wire from Ubuy in São Tomé and Príncipe. Ubuy offers a reliable platform where you can find this specific module, ensuring you have access to quality fire detection components for your projects or installations.
Lufasa Smoke Detectors & Fire Alarms Editorial Review
Avaliações e Classificações dos Clientes
-
5 Estrela
100%
-
4 Estrela
0%
-
3 Estrela
0%
-
2 Estrela
0%
-
1 Estrela
0%
Avaliar este produto
Partilhe as suas ideias com outros clientes
Platform Trust & Buyer Confidence
“The product received very good packaging & safe…Thank You”
“Accurate delivery timing given”
“Not madly expensive like I thought, and much quicker than promised.”
“Never dealt with Ubuy before, but everything worked out great. Seamless cross border purchasing and shipping. Thanks!”
“The process was smooth, with clear communication and timelines. This was my 1st purchase and I am really impressed. I will definitely be coming back.”
Histórico de preços do produto
Informação importante
- Limitações: para produtos expedidos internacionalmente, tenha em atenção que qualquer garantia do fabricante pode não ser válida; opções de serviço do fabricante podem não estar disponíveis; manuais de produtos, instruções e avisos de segurança podem não estar nas línguas do país de destino; os produtos (e materiais que o acompanham) pode não ter sido concebido em conformidade com as normas, especificações e requisitos de rotulagem do país de destino; e os produtos podem não estar em conformidade com a voltagem e outras normas elétricas do país de destino (requerendo assim o uso de um adaptador ou conversor caso seja apropriado). O destinatário é responsável por garantir que o produto pode ser legalmente importado para o país de destino. Quando encomenda à Ubuy ou aos seus afiliados, o destinatário é o importador de registo e deve estar em conformidade com todas as leis e regulamentos do país de destino.
- Nem todos os produtos listados na Ubuy estão à venda, uma vez que a Ubuy é um motor de busca global. Os produtos estão sujeitos a leis de exportação/comércio.
STD 657225
Encomende já e receba por volta de Terça-feira, Agosto 18
Este artigo não está restrito no meu país. (Clique no link acima se este artigo não estiver restrito no seu país, para que a nossa equipa o analise e permita.)
QTY:
PCI DSS compliant and ISO 27001:2022 certified, with encrypted payments and full buyer protection on every order.
Recursos e benefícios
- Accurate detection of flames or light sources within 760-1100 nanometer wavelength.
- Stable and reliable performance with a 24V power input switching module.
- Detection angle of about 60 degrees, highly sensitive to flame spectrum.
- Adjustable sensitivity for tailored detection levels.
- Fast response with a relay output that triggers directly.
- Ideal for flame alarm systems, ensuring safety in various applications.
Ubuy Assurance
Experience worry-free shopping with 100% original products, PCI DSS-compliant payment security, ISO 27001-certified data protection, the fastest cross-border delivery, free returns *, and secure packaging on every order.